[Improvement Case] Key Points for Trouble Prevention and Response in Ladder Circuits
A production system has been established with measures to address issues caused by past ladder circuits! Preventive measures have been implemented.
Here is an example of improvements in ladder circuit design. Due to issues with the ladder circuit, it is possible that equipment or production lines may be halted. When equipment or production line stoppages occur, costs arise from the need to review the ladder circuit each time and from the work involved in changing the ladder circuit, as well as costs resulting from decreased productivity on the production line. By sharing the details of past issues and the corresponding solutions, we can reflect the response methods in the ladder circuit in advance. This approach can reduce the incidence of issues and enable a quick return to the production line in the event of a problem, thereby minimizing ladder circuit failures. [Improvement Effects] - Achieving a stable ladder circuit - Reducing the incidence of failures - Enabling a quick return to the production line *For more details, please refer to the related links or feel free to contact us.
- Company:東亜エレクトロニクス株式会社 東亜電機カンパニー
- Price:Other